A challenge for this project was the task of repairing such a large area of space with the maximum amount...
Serving Connecticut, NY, MA and RI
A challenge for this project was the task of repairing such a large area of space with the maximum amount...
The project was started in late fall, which made it impossible for us to paint the ceiling at that time....
A challenge for this project was making sure that we did not interfere with the security measures of the correctional...
The firehouse needed an upgrade as the previous flooring systems failed to provide the necessary traction and proper non-slip for...
With this project we faced a couple struggles that we were able to successfully overcome. Initially we had to heat...
This project presented the team with some struggles which included having to duplicate and replicate wood components. We also had...
This case study highlights the successful facade restoration of the Springfield Armory in Springfield, MA. The project was led by...
After many years of painting we ran into over 15 coats of paint on the woodwork on this historical building....
Deep River‘s distinctive Town Hall was built in 1893 in a “flatiron” shape to conform to its location, where Elm and...
The nature of this project was very unique and posed a number of challenges. One due to the lease structure...
This project has an enormous amount of change orders due to the fact that this is the first phase of...
This project was a fast paced project in the middle of the summer. We had to remove existing coating all...