Serving Connecticut, NY, MA and RI
Click on a photo to enlarge.
After years of abuse from the young children throwing balls and rocks against the gymnasium exterior during recess. Greenwich Public Schools contracted with Scholar Painting to restore the exterior metal panels on the building. It took 4 highly trained painters over 450 man hours to bring the exterior back to original condition.
For this structure we made sure to carefully strip all the previous coatings, mold, mildew and last remnants of coatings before painting the exterior structure.
Throughout this project we had to remove existing coating down to the substrate then painted around all steel structures and basketball hoops as well as score boards.
300 ft. of Wabo Expansion joints
A beautiful custom built coffered ceiling was stained in the clubs bar area by Scholar Painting
our service area